Windfarm extension works commenced

Further extension works have commenced to Ballybane Windfarm.  Works to include the installation of 2 Nr. Enercon E70 wind turbines including the provision of in-situ bases, steel fixing, concrete pouring and finishing.  Adjustment works will be required to the existing substation to allow for a new switching station and upgrading of controls.

IMG_3590